Manual Testing Multiple Choice Questions and Answers for Freshers & Experienced pdf free download

0.  What are the Testing Levels?
1.  Cost of quality = Prevention Cost + Appraisal cost + Failure cost
2.  A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as “fishbone diagram” what is this?
3.  It measures the quality of processes used to create a quality product.
4.  Variance from product specifications is called?
5.  Verification is _________.
6.  White box testing is not called as___________.
7.  Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as
8.  Retesting of a single program or component after a change has been made?
9.  Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC)
10. The testing which is done by going thro' the code is known as,
11. Configuration Management Plan describes the Configuration Management procedures and structures to be used.
12. This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as
13. Phase Definition. It will come under
14. Software testing which is done without planning and Documentation is known as
15. Acceptance testing is known as
16. Retesting the entire application after a change has been made called as?
17. Boundary value analysis belongs to which testing method?
18. It measures the quality of a product
19. What are the Types of Integration Testing?
20. Product Risk affects The quality or performance of the software.
21. A metric used to measure the characteristic of documentation and code called as
22. Which is non-functional software testing?
23. The process that deals with the technical and management issues of software development called as?
24. Executing the same test case on a modified build called as
25. Which is Black-Box Testing method?
26. Business Risk affects The Organization developing or Procuring the software.
27. Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups.
28. Automation Testing should be done before starting Manual testing.
29. Earlier a defect is found the cheaper it is to fix it.
30. Informing to the developer which bug to be fix first is called as
31. Software Testing is a process of evaluating a system by manual or automatic means and verify that it satisfies specified requirements or identity differences between expected and actual results.
32. Retesting modules connected to the program or component after a change has been made?
33. An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under
34. Alpha testing will be done at,
35. SPICE Means _______.
36. Requirements Specification, Planning, Test case Design, Execution, Bug Reporting & Maintenance This Life Cycle comes Under
37. It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes.
38. Standards and procedures for managing changes in an evolving software product is called?
39. Path Tested = Number of Path Tested / Total Number of Paths
40. This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as
41. This type of test include, how well the user will be able to understand and interact with the system?
42. Defects generally fall into the following categories?
43. What is correct Software Process Cycle?
44. Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as
45. Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required
46. Beta testing will be done by
47. Validation plan describes the approach ,resources and schedule used for system validation
48. Integration, It will come under
49. Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
50. Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
51. A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as
52. Check Sheet(Checklist) is considered a simple , but powerful statistical tool because it differentiates between two extremes.
53. Application should be stable. Clear Design and Flow of the application is needed for Automation testing.
54. Quality plan describes the quality procedures and standards that will be used in a project.
55. How severely the bug is effecting the application is called as
56. Project Risk affects The Schedule or Resources.
57. The name of the testing which is done to make sure the existing features are not affected by new changes
58. Management and Measurement, It will come under
59. AdHoc testing is a part of
60. Cost of Production = Right The First time cost(RTF) + Cost of Quality.
61. ------------- means under what test environment(Hardware, software set up. the application will run smoothly
62. TQM represents ________.
63. Optimization, Defect Prevention, and Quality Control. Its come under the
64. Unit Testing will be done by
65. Beta testing will be done at
66. A Plan to overcome the risk called as
67. Which of the following is not one of the techniques to find defects
68. Quality Assurance methods are usually considered
69. Who has the primary responsibility of setting the quality culture in the organization?
70. Verification is ________.
71.  A Regression test is
72. If an expected result is not specified then:
73. Which of the following is not a static testing technique
74. Which of the following statements about component testing is not true?
75. During which test activity could faults be found most cost effectively?
76. The purpose of requirement phase is
77. Which, in general, is the least required skill of a good tester?
78. The process starting with the terminal modules is called
79. The inputs for developing a test plan are taken from
80. Function/Test matrix is a type of
81. Defect Management process does not include
82. Software testing accounts to what percent of software development costs?
83. How much testing is enough
84. Which of the following is not a characteristic for Testability?
85. Which of these can be successfully tested using Loop Testing methodology?
86. Inspections can find all the following except
87. When a new testing tool is purchased, it should be used first by:
88. What is the purpose of test completion criteria in a test plan:
89. Which of the following is NOT a black box technique:
90. The main focus of acceptance testing is:
91. Expected results are:
92. Which of the following is NOT part of system testing:
93. Which of the following is not part of performance testing:
94. Which one of the following are non-functional testing methods?
95. During the software development process, at what point can the test process start?
96. Acceptance test cases are based on what?
97. Independent Verification & Validation is
98. Which of the following is not described in a unit test standard?
99. Which of the following is a form of functional testing?
100. Test cases are designed during: